Environmental Technology Workshops

 

REGISTRATION REQUIRED

 

If you would like to enroll in one of the workshops listed, please go to the Information Request Form page. This is not an enrollment but will secure a place for you in the workshop. You will be notified that the information has been received and accepted in the workshop. Most workshops now have a limited number of spaces available, so it is important to submit the information as early as possible. You will need to know the date and the location of the workshop on the enrollment page.

Spring Workshops

 

  • February 9th & 10th       

    Current Topics - EWT 2311-460

    TBA

    8:30am - 4:30pm

 

  • March 3rd & 4th

    Small Water & Wastewater Systems - EWT 1150-040 & 041

    Virtual Workshop

 

  • March 8th-11th   

    C C & Backflow Prevention - EWT 1262-461

    8:30am - 5:00pm 

    Coffeyville, KS

 

  • March 10th & 11th

    Cross Connections Control - EWT 1261-461

    8:30am - 5:00pm

    Coffeyville, KS        

 

  • April 7th & 8th

    Wastewater Stabilization Ponds - EWT 2251-460

    8:30am - 4:30pm

    FSCC Miami County Campus

    501 Hospital Dr. Suite 300    

    Paola, KS

 

  • April 12th - 15th

    C C & Backflow Prevention - EWT 1262-460

    8:30am - 4:30pm

    Dodge City, KS

 

  • April 14th & 15th

    Cross Connections Control - EWT 1261-460

    8:30am - 4:30pm

    Dodge City, KS

 

  • May 5th & 6th

    Safety & Math Workshop

    8:30am - 4:30pm

    Harley-Davidson Building

    274 N. Industrial Dr.    

    Frontenac, KS

           

 

To secure placement one of these classes or workshops email or call:

(800) 874-3722, Darlene Wood, ext. 3420,

darlenew@fortscott.edu

 

All workshops listed are 2 day workshops except Small Water Systems and Small Wastewater Systems. Cost of 2 day workshop is $140.00 for 10 CEU’s and 1 college credit. If you only attend 1 day of a 2 day workshop the cost is still $140.00, 5 CEU’s and no college credit.

 

Small Water Systems and Small Wastewater Systems- If you attend one day, either Water or Wastewater, cost is $70.00, 5 CEU’s and no college credit. If you attend both days, Water and Wastewater, cost is $140.00, 10 CEU’s and 1 college credit.